Foundation is complete...
The forms came off the foundation walls Monday, and the supplies to seal the foundation were dropped off. The drainage tile (which to me look like pipes) will go around the bottom of the foundation of the whole house, and connect to the sump pit to complete the "drain tile".
Sump pit. Once the concrete is poured it will be flush with the floor.
The black tar is to weather proof the foundation walls. It's rolled on like paint onto a wall. Cool!
The Stone slinger machine was a hit with the kids. They found it cool to watch stones being chucked all the way to the other side of the house. We were able to snag a few cool shots...
Once the stone was in place around the whole base of the foundation, the inspector came out and gave us another GREEN light to continue with our project.
Yay!
More to come, stay tuned!