Wednesday, September 12, 2018
Trench digging
Here Brandon is prepping for our water supply to be hooked up from the well to the house. A trench needs to be dug for the water supply, as well as a trench for the septic hook up. This is big stuff, as it means we will be moving in very soon! We should be about 2-3 weeks away now! Once water is hooked up, septic hooked up, tile complete in master bath, as well as toilet installed and vanity we will be in! Of course all after we get inspected and are approved by the county to move in. Cross your fingers and say a little prayer that all goes well. This has been a very long long time coming!
Master Bathroom
For the Master Bathroom we really wanted to keep it clean, fresh, and luxurious feeling. Brandon is almost done tiling the shower. We ran out of tile so had to order more which put us back a bit. Not to worry though, we have had plenty of other projects to keep us busy. Once the Master bath is complete I'll post more pics, but here we are so far.
Starting with the longest run of the room first, then working your way out side to side. Lots of planning, measuring, and configuring before laying the tile.


More to come soon, stay tuned...
Monday, September 10, 2018
Tile tile tile
Subscribe to:
Posts (Atom)






