Wednesday, July 22, 2009
April, 2009
April was a slow month for progress inside the house as we did a lot in the yard. Lots of edging outside and mulch was put down on all the new beds. We started on the dining room area and had to remove the popcorn ceiling and sand down the textured paint that had previously been used. New doors were added to the second bedroom and bathroom so now all of them are matching.

Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment